TODENTSUHeadquartersBuilding

Return

Completion Date

2004/7/1

Building Use

Offices (Head Office building)

Location

Minato-ku, Tokyo

Site Area

1,134.00m2

Floor Area

8,673.09m2

Building Area

822.00m2

Structure/Stories

Steel structure (seismic isolated structure) Basement: Reinforced Concrete structure (partial Steel-frame Reinforced Concrete structure)
1 basement level, 10 stories above ground, 1 penthouse floor

photo:TODENTSUHeadquartersBuildingphoto:TODENTSUHeadquartersBuilding
Photography:Kawasumi Architectural Photograph Office

The reconstruction of the TODENTSU Headquarters Building, part of the Shiodome redevelopment project.
While following the design code of the surrounding Italian district, the details and colors have been carefully considered to achieve a composed exterior worthy of the company's headquarters.
With more than three times the floor space of the old headquarters building, the lower and mid-level floors function as office space, while the upper floors accommodate the conference rooms, staff canteen, and executive floors, etc. With long-span column-less office space and the implementation of LonWorks, a centralized control system, as the BAS, this is the definitive next generation building.
In addition, as the local disaster preparedness center, this building not only incorporates a seismic isolation structure, it will also provide power and serve as a water supply and drainage site in times of disaster.