ComanyInc.,Headquarters-FactoryNo.1

Return

Completion Date

2004/9/1

Building Use

Factory

Location

Komatsu-shi, Ishikawa prefecture

Site Area

140,946.19m2

Floor Area

4,139.63m2

Building Area

4,511.90m2

Structure/Stories

Steel structure, 1 story above ground

photo:ComanyInc.,Headquarters-FactoryNo.1photo:ComanyInc.,Headquarters-FactoryNo.1
 

This building was designed as an extension to the Comany Inc., Headquarters factory.
The design prioritizes factory functionality, and thorough cost minimization was undertaken using the CM system.
In appearance, the building is assimilated into the existing group of factory buildings by using the same exterior cladding material. Since the area receives strong winds coming in from the sea as well as sandy winds from the mountains, special consideration was given to steel frame corrosion. The coating plant opted for the powder coating system that uses non-solvent non-hazardous materials, compartmentalization of the line area and type 1 ventilation systems to create an interior environment that takes product coating quality into consideration.
In addition, due consideration was given to the environment with all materials cleared from the existing car park at the planned site and other excavated materials re-used on site.